Best Barns tahoe_1216f Manual de instrucciones Pagina 10

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 9
Step 8 Assemble Front Wall
5. Cut a 4x8 siding panel in half and install the siding with the tongue edge on the left end. The
siding will extend 3-1/2" beyond the end of the wall stud. Siding should extend 3/4" below the
bottom plate unless installing building on concrete slab.
1. Cut (2) two 2x4-12' boards to 11'- 5" in length.
2. Install (4) four pre-cut wall studs between the plates as shown below.
3. Install the 2x10 door header assembled in Step 2.
4. Cut (2) two pre-cut wall studs and install under the door header.
Cut Edge
Tongue Edge
OSB Filler
2x4 Header Supports
cut to fit
2x10 Door header
Assembled in Step 2
11' - 5"
2x4 Plate
99" Opening Between Wall Studs
17-1/2"
Pre-cut Wall
Studs
11' - 5"
2x4 Plate
6. Install (2) two 3-1/2" x 48" OSB fillers under the door header.
7. Install pre-cut siding from our kit over the door opening.
8. Install remaining siding panel on right side.
Siding Extends 3-1/2"
Past 2x4 Stud
17-1/2"
Vista de pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14 15 ... 23 24

Comentarios a estos manuales

Sin comentarios