2x4 Hanger
Cover 'X' Marks on
2x6 Beams
Step 15 Install Loft Floor Joists
Step 16 Install Loft Flooring
Install 72" long 2x4s between the front and
rear beams and the 2x4 joist headers. Use
2x4 hangers with hanger nails.
1. Install 7/16" OSB loft flooring on back loft floor joists. Loft flooring is flush with outside of
top wall plate. Use 7d sinkers spaced 12” apart.
2. Repeat to install loft flooring at the front of the building.
3. Cut 3-1/2" x 56" floor fillers and install on top of side wall plates between the loft flooring.
48" x 96" Flooring
3-1/2" Filler
48" x 48" Flooring
32" x96" Flooring
32"x48" Flooring