Best Barns tahoe_1216f Manual de instrucciones Pagina 23

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 24
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 22
Frame Optional Walk-in Door Opening
1x6 Pine Jamb
1x4 Door Trim
Front Wall
34-1/2"
door opening
80-1/2" Hader
Supports
2x4 Header
2. Install (2) two 1x6-7' white pine boards
on the sides of the door opening, flush
with the siding.
Galv. Door Sill
6. Install 92-5/8" long 2x4s on the inside of the door opening to support the door track.
Step 24 Install Door Jamb & Trim
1. If you ordered the optional floor, install the galvanized door sill included with the floor.
Secure sill with pan head screws.
1x6-7 Pine Jamb
1x4 Door Trim
1x4 Door Trim
1. Cut (2) two 80-1/2" long header supports from pre-
cut wall studs.
2. Cut (2) two 2x4s to a length of 37-1/2" from a pre-
cut wall stud. Cut a filler from a 3-1/2" x 48" OSB
board and assemble a door header.
3. Install door header over header supports.
Keystone
3. Install 1x6-4' white pine boards
across the top of the opening.
4. Install 1x4-84 3/4"' trim boards
along each side of the door opening.
5. Install (2) trim boards and a
keystone across the top of the door
opening.
7. Cut 2x4s used for wall bracing and
install 2x4s across the top of the
door opening.
Vista de pagina 22
1 2 ... 18 19 20 21 22 23 24

Comentarios a estos manuales

Sin comentarios