
Building Tip: Install ridge vent in lieu of shingles caps. Ridge vent provides ideal ventilation,
preventing heat and moisture from damaging your building or its contents.
Optional ridge vent provides
ideal ventilation.
Air
Space
Roof Covering: 12 bundle shingles - 8 pcs. roof edge - optional felt paper 1 roll
Step 21 Install Roof Sheathing
Plyclip
1. Install roof sheathing flush with the face of the rear gable trim. Install the
lower sheathing first. Use a straight edge to alien the top of the sheathing
with the top of the truss. See Detail 'B'. Insert (2) two plyclips into the roof
sheathing between each truss at the top row. Use 7d sinkers, spaced 12" apart.
13" Roof Sheathing In Kit
Straight Edge
DETAIL 'B'
Truss
Step 22 Install Roofing — Not Supplied in Kit
Install metal roof edging perimeter of the roof area.
If you are not installing shingles at this time, you can
purchase felt paper to protect the sheathing. Install
the felt paper before you install the metal roof edge.
Install shingles according to the instructions on the
wrapper. If you need more detailed instructions on
installing shingles, there are good publications at book
stores or newsstands.
Truss
2. Cut and install 1x4 corner trim,.
42” x 72”
48” x 72” from
42” x 96”
48” x 48”
13” x 72”
13” x 72”
13” x 60”
Install This Row First
Cut from
4x8 OSB Sheathing
48” x 84”from
Shipping Pallet
42” x 36”
Comentarios a estos manuales