Step 12 Set Walls
Layout both beams for the spacing of the loft floor joists.
The 'X' marks where the floor joist will be placed.
Step 13 Layout Loft Joist Spacing on 2x6 Beam
2x4 Bottom Plates
1. Set the back wall panel between the sidewalls. Secure wall panels together at the corners.
Use (4) four 10d coated nails per corner. Nail wall panels to the floor. Nail through the bottom
plate. Space 10d sinkers 24" apart.
2. Install the front wall frame between the sidewalls.
3. Install the last siding panel on the sidewalls. Nail along the siding edge where the sidewall
siding panels overlap.
4. Remove the 2x4s from the shipping pallet and use them to brace the wall to hold them straight.
5. Cut and remove the bottom 2x4 in the door opening.
Nail Along
Siding Edge
Front Wall Frame
2x4 Wall
Brace
23-1/4"
24"
24"